Pop-Up Court adidas PANOARENA 180° with blue turf and yellow light masts at night

Pop-Up Court · Rental

Padel where your guests are.

We bring a ready-to-play padel court to your event – on steel plates, without a foundation, installed and dismantled by our team.

  • 8 mmsteel plates instead of a foundation
  • Set-up & removalby our team
  • Indoor & outdoorsingle-day event or longer rental
  • 7Pop-Up Tour stops

What is a Pop-Up Court?

A real court – just temporary.

A Pop-Up Court is a full-size padel court that we set up at your chosen location for a limited period. No sample, no shortened demo: you play on the same court as on a permanent facility.

This is made possible by the Try & Buy Plate System from AFP Courts. The posts are installed exactly as on a permanent court – they are simply anchored in the steel plate instead of a foundation.

Layered model of a padel court: court, artificial turf and steel-plate foundation

What it’s rented for.

  • Try & Buy

    Thinking about building your own courts? Rent the court first and play on exactly the model that would later stand permanently. The posts are installed just as they are on a permanent facility.

    Enquire
  • Events & trade fairs

    At corporate events, trade fairs and city festivals a court quickly becomes a meeting point. We set it up indoors or outdoors and collect it after the event.

    Enquire
  • Clubs & tournaments

    For a tournament, an open day or a trial period at your club – before you decide on courts of your own.

    Enquire
  • Municipalities & public bodies

    Towns and public bodies can rent too, for example to show padel on a square or at a city festival.

    Enquire

What’s included.

Type, number, equipment, period and price are set out in the quote. These services are part of the Pop-Up Court:

  • Court as quoted

    One or more courts with the components listed in the quote – for example the adidas PANOARENA 180° from our Pop-Up Tour.

  • Try & Buy Plate System

    Steel plates (8 mm) form the foundation; the posts are bolted directly into the plates. No concrete, no drilling – fully reversible.

  • Transport

    Delivery and collection by truck or semi-trailer – shown in the quote as an ancillary service.

  • Installation & dismantling

    Carried out by us or by commissioned specialists on the agreed dates.

  • Handover with report

    After installation we hand over the court with a handover report and photo documentation; dismantling ends with a return report.

  • Site planning

    With our “Delivery & installation” checklist we clarify access, space, ground and power in advance.

Corner post of a court bolted to the steel plate of the Try & Buy System Threaded hole in a steel plate of the Try & Buy Plate System

Optional extras

Not included in the rental, but can be quoted separately:

  • Ground, levelling and foundation work (e.g. point or strip foundations indoors)
  • Electrical work, cabling of several courts and cable bridges
  • Structural verification and technical certificates
  • Permits, security and interim storage

How the rental works.

From your first request to the return – with fixed dates and reports. Click through the steps.

Any time

Request

What you do
Fill in the form: location, period and number of courts – single-day event or longer rental.
What we do
We get back to you with a quote and the checklist for your site.

After your request

Quote & checklist

What you do
Check the quote and go through the “Delivery & installation” checklist for your site.
What we do
Quote with rental price and ancillary services such as transport, installation, dismantling, travel and accommodation.

On signing

Rental agreement

What you do
Sign the agreement and pay 50 % of the rental price – unless agreed otherwise.
What we do
Confirm the dates for installation and dismantling.

14 to 7 days before

Preparation

What you do
Signed checklist back no later than 14 days before installation, remaining 50 % no later than 7 days before. Proof of insurance as per contract.
What we do
Plan transport and the installation team for your site.

Installation day

Installation & handover

What you do
Keep the installation area clear and accessible; power is connected by your qualified electrician.
What we do
Delivery, installation and handover with report and photos.

Event and after

Event & dismantling

What you do
Play. Outdoors, a responsible person stops play in storms or thunderstorms.
What we do
Dismantling on the agreed date, return report with photos.

What your site needs.

The minimum requirements from our “Delivery & installation” checklist. Something doesn’t fit? Talk to us early – there is often a solution.

Delivery

  • Accessible for a semi-trailer up to 40 t (approx. 16.5 m long, 2.55 m wide, 4.0 m high)
  • Paved, load-bearing access without weight or height restrictions
  • Space for manoeuvring, turning and side unloading
  • Secured stopping or loading zone

Transport route

  • Level, paved and load-bearing throughout for forklifts or pallet trucks
  • All gates and doors at least 3 m wide and 4 m high
  • No changes in level – ramps or lifts to be agreed in advance
  • Free of obstacles for installation and dismantling

Installation area

  • Approx. 10 × 20 m per court plus installation and safety area
  • Level, paved and load-bearing ground
  • Indoors: floor covering and load capacity to be clarified in advance
  • Cleared and accessible on the installation date

Power

  • Connection by the hirer’s qualified electrician
  • Sufficiently rated for the agreed components, e.g. lighting
  • Cabling of several courts to be clarified in advance if needed

Permits & insurance

  • Official permits (e.g. event, special use, temporary structures) are the hirer’s responsibility
  • Event or operator liability insurance
  • Insurance of the court against damage, theft, vandalism and natural hazards

Security & disposal

  • Security or guarding outside operating hours
  • Outdoors: a responsible person who stops play in storms or thunderstorms
  • Container for packaging material from the start of installation

All details are governed by the special rental conditions for Pop-Up Courts.

Previous stops.

With the AFP Courts Pop-Up Tour, our court has already been used at these events and partners.

  • Pop-Up Court at Challenge Roth 2026

    Challenge Roth

    Roth, Germany · Outdoor

    1 adidas PANOARENA 180° (1 Try & Buy System)

  • Pop-Up Court at Hafengeburtstag 2026

    Hafengeburtstag

    Hamburg, Germany · Outdoor

    1 adidas PANOARENA 180° (1 Try & Buy System)

  • Pop-Up Court at INTERSPORT redblue 2026

    INTERSPORT redblue

    Germany · Indoor

    1 adidas PILLARFORCE FX (Try & Buy System)

  • Pop-Up Court at Rotherbaum Stadion 2026

    Rotherbaum Stadion

    Hamburg, Germany · Outdoor

    1 adidas PANOARENA 180° (1 Try & Buy System)

  • Pop-Up Court at World Changer Stanglwirt 2026

    World Changer Stanglwirt

    Going am Wilden Kaiser, Austria · Outdoor

    1 adidas PANOARENA 180° (1 Try & Buy System)

  • Pop-Up Court at Hockey EM 2025

    Hockey EM

    Mönchengladbach, Germany · Outdoor

    1 adidas PANOARENA 180° (1 Try & Buy System)

  • Pop-Up Court at Schierker Feuerstein Arena 2025

    Schierker Feuerstein Arena

    Wernigerode, Germany · Outdoor

    1 adidas PANOARENA 180° (1 Try & Buy System)

Request

Request a Pop-Up Court.

Tell us when and where you want to play – we will get back to you with a quote and the checklist for your site.

Fields marked * are required.

Free · 30 minutes · video call

Let’s plan your padel project together.

  • Which courts suit your site and budget
  • Rough cost and time frame
  • Permits and financing
The SCC Courts team at the World Padel Summit
Your team for consulting, planning and construction